What should be paid attention to when the rotary drilling rig is driving grid piles on the mountain


For the work of drilling grid piles with rotary drilling rigs on the mountain, there are some things to pay attention to:

1. The on-site survey and site leveling work should be done in advance. If there are steep slopes, cliffs, soil erosion, etc., measures should be taken in time to repair them;

2. To evaluate the geological conditions of the work site, one should know the distribution of soil layers, stone layers and rock layers, as well as the height of the groundwater level and the existence of obstacles, so as to make reasonable construction arrangements;

3. During the construction process, special attention should be paid to safety protection measures, such as setting up slope protection wire mesh when working on slopes, to avoid accidents such as landslides;

4. When drilling the drill pipe, the level of the drilling rig should be kept stable, especially when working on mountains, special attention should be paid to prevent the drilling rig from sliding or overturning and other safety issues;

5. Finally, the cleaning work after construction should be done well to keep the construction site clean and tidy.

I hope these precautions can be helpful to your rotary drilling rig driving grid piles on the mountain

中盛
全部
  • 全部
  • 产品管理
  • 新闻资讯
  • 介绍内容
  • 企业网点
  • 常见问题
  • 企业视频
  • 企业图册

The company has over 80 sets of various types of basic equipment, mining equipment, earthwork equipment, etc.